Adopt a project
![](https://vbcalaska.org/wp-content/uploads/2016/04/DSC_0139.jpg)
There’s always multiple projects happening at Victory, we have opportunities for you to get involved either through adopting a project and bringing a work team or by financially contributing to a project. Some work teams choose to do both. If you’d like to adopt a project, please see the Work teams tab for information specifically for work teams.
Projects
In order of Importance
![](https://vbcalaska.org/wp-content/uploads/2023/11/IMG_1408-768x1024.jpg)
![](https://vbcalaska.org/wp-content/uploads/2023/11/IMG_1405-768x1024.jpg)
Alpine Retaining wall rebuild
Manpower needed
3 weeks 4-6 each week
Physical needs
Mini-Excavator
Pilings – Donated
Retaining wall material – Donated
Time Frame
Summer/Fall 2024
![](https://vbcalaska.org/wp-content/uploads/2024/06/IMG_0289-completed-1024x768.png)
Roof Miracle Lodge and install earthquake braces
Manpower needed
4 weeks, 10-12 each week
Financial need
Materials have been donated.
Time Frame
Summer 2024
![](https://vbcalaska.org/wp-content/uploads/2023/10/IMG_7530-1024x768.jpg)
Barn roof
Manpower needed
2 weeks, 8-12 each week
Financial need
$15,000
Time Frame
August 2024
![](https://vbcalaska.org/wp-content/uploads/2023/11/IMG_1398-1024x768.jpg)
Fireplace replacement in Miracle Lodge
Manpower needed
1 week 2-3 people
Financial need
$9,500
Time Frame
In Progress
![](https://vbcalaska.org/wp-content/uploads/2023/10/IMG_7529-1024x768.jpg)
Teepee refurbish, new roof, and touch up interior
Manpower needed
2 weeks 5-8 each week
Financial need
$10,000
Time Frame
Spring 2024
![](https://vbcalaska.org/wp-content/uploads/2023/11/IMG_1409-1024x768.jpg)
R.V. park, Landscape, fire pits, picnic benches
Manpower needed
2 weeks, 4-6 each week
Financial need
$4,000
Time Frame
Spring 2024
![](https://vbcalaska.org/wp-content/uploads/2023/10/IMG_7526-rotated-e1711666583361-1024x757.jpg)
Shooting Range Rebuild
Manpower needed
1 week 2-3 people
Financial need
$4,500
Time Frame
Fall/Winter 2023
![](https://vbcalaska.org/wp-content/uploads/2023/10/IMG_7521-1024x768.jpg)
Birch dorm, repair foundation, install drain tile, remodel and build out interior
Manpower needed
7 weeks, 4-8 each week
Financial need
To Be Determined
Time Frame
Summer 2024 and fall/winter 24/25
![](https://vbcalaska.org/wp-content/uploads/2018/01/IMG_4170.jpg)
New bathrooms at Alpine
Manpower needed
7 weeks with 8-10 each week
Financial need
$90,000.00
Time Frame
Summer 2024/2025
![](https://vbcalaska.org/wp-content/uploads/2023/11/IMG_1413-768x1024.jpg)
Spruce Lodge remodel, Entry and bathrooms
Manpower needed
4 weeks, 8-12 each week
Financial need
$25,000
Time Frame
Fall 2024
Please Note: All donations are given to Victory Bible Camp to be used at camp’s discretion.